10. GRUNDFOS TRANSFER PUMP DESCALING
The transfer pump P-210 will have scale deposits build up on the impellors and bearings in the pump. This will lead to reduced pumping performance and eventually to the pump stalling. The scale is comprised of a mineral and iron scale. This scale is ...
11. Maintenance Summary
MAINTENANCE TASKS DAILY WEEKLY MONTHLY ANNUALY Every 2 years Drain and clean filtrate tank V-170 X Inspect to make sure all polymer distribution lines are clear and free flowing X Inspect screen for tares or damages X Drain and clean screw press ...
SW APPENDIX A: INITIAL SYSTEM STARTUP
WARNING: Ensure all isolation valves are fully open and that all vessel drains are fully closed prior to the startup of the system. Ensure that all the RO Clean in Place (CIP) Valves are fully closed. STARTUP SECOND WAVE STARTUP – CLARIFIER AND ...
4. Microscreen Setup and Operation
MICROSCREEN Microscreen Setup Proper setup of the Microscreen involves adjusting two devices to ensure effective draining of solids through the screen surface. These devices are the floc tank adjustment and the screen angle adjustment. FLOC TANK ...
Appendix B: groControl System
The grōCONTROL system is designed to enhance the operation of the First Wave system by automating the TSS (Total Suspended Solids) and pH readings of the process liquids at specified time intervals. When grōCONTROL is activated, it will automatically ...