The maintenance tasks are summarized as following:

 

MAINTENANCE TASKS

DAILY

WEEKLY

MONTHLY

QUARTERLY

ANNUALY

Every 2 years

Drain and clean the Clarifier (V-190)

 

X

 

 

 

 

Replace Cartridge Filter Cartridges

X / As required

 

 

 

 

 

RO Cleaning (AutoClean Process)

X

 

 

 

 

 

RO Manual Cleaning

 

X / As Required

 

 

 

 

P-210 Descaling

 

 

 

 

X/As Required

 

Probe RO Vessels

As Required – When Permeate Quality Deteriorates

Calibrate CIP pH Probe

 

 

 

X

 

 



The operational checks are summarized as following:

MAINTENANCE TASKS

Hourly

Every       4 Hrs

Every 12 hrs

Daily

Weekly

Clarifier Weir TSS Measurement

 

X

 

 

 

Clarifier Jar Test / Sludge Pump Adjustment

 

 

X

 

 

Cartridge Filter Discharge TSS Measurement

 

X

 

 

 

Monitor Cartridge Filter DP

 

X

 

 

 

Monitor RO Recovery

X

 

 

 

 

Monitor RO DP Across Both Stages

 

X

 

 

 

Monitor RO Permeate Quality

 

 

 

 

X

Check CIP chemical levels (HCl and NaOH)

 

 

 

X

 


    • Related Articles

    • 11. Maintenance Summary

      MAINTENANCE TASKS DAILY WEEKLY MONTHLY ANNUALY Every 2 years Drain and clean filtrate tank V-170 X Inspect to make sure all polymer distribution lines are clear and free flowing X Inspect screen for tares or damages X Drain and clean screw press ...
    • 5. Screw Press Setup and Operation

      SCREW PRESS When operating the screw press, adjustments may be necessary to achieve the desired moisture content in the solids. The moisture content can be controlled by adjusting the pressure at the outlet of the screw press. Here are some ...
    • APENDIX A: THE POLYFAST SYSTEM

      LWR’s PolyFAST unit is specifically designed to automatically prepare a 0.5% concentration of grō17 polymer, ensuring smooth system operation with minimal supervision or operator intervention. It is essential to calibrate the unit during the initial ...
    • 4. Microscreen Setup and Operation

      MICROSCREEN Microscreen Setup Proper setup of the Microscreen involves adjusting two devices to ensure effective draining of solids through the screen surface. These devices are the floc tank adjustment and the screen angle adjustment. FLOC TANK ...
    • 13. GENERAL TROUBLESHOOTING

      SYMPTOM CAUSE ACTION System won't start ESD Button Pushed Check that all ESD buttons are in their "OUT" position. Press 'RESET' Button Main Feeder Protection Tripped Check feeder protection for blown fuse or tripped circuit breaker. Check wiring for ...