Recent Articles
1. TOUCH SCREEN OPERATION
The touch screen operation is the same as First Wave system with more pages for second wave components. The icons are operated in the same way. It needs to be pointed out that RO autoclean time shall be adjusted as following: Pressing and holding the ...
2. SYSTEM STARTUP AND SHUTDOWN
WARNING: Ensure all isolation valves are fully open and that all vessel drains are fully closed prior to the startup of the system. Ensure that all the RO Clean in Place (CIP) Valves are fully closed. For Initial Startup of the Second Wave, Refer to ...
3. CHEMISTRY SETTING AND ADJUSTMENT
GOALS OF CHEMICAL TREATMENT Microscreen filtrate TSS Size of flocs on microscreen Strength of flocs on microscreen Bag filter dp alarm Goals <1.5% of Manure TSS Large Strong Less than once every 24 hours For more information on Microscreen chemistry ...
4. Clarifier
The operation of the Clarifier is dependent upon the amount of settled sludge in the cone of the Clarifier and the performance of the jar test samples taken before the inlet to the Clarifier. Before starting up the system, ensure the clarifier sludge ...
5. CARTRIDGE FILTER
CARTRIDGE FILTER CHANGE: If the differential pressure across the cartridge filters rises to 25 PSIG, the system will alarm and warn the operator that the filters should be replaced soon. If the differential pressure rises to 40 PSIG, the system will ...